portland-2026 — site plan and estimate — 1817 East Portland Street The concrete for a new ADU foundation in the rear southwest corner of the lot: 27 feet 4 inches by 23 feet 10 inches, with the plans' stated ADU area of 651 square feet. The slab, footings, post footings and shower pad are poured as one, per sheet S1 of the plans dated 12/09/25. Formwork, concrete material, two $350 pump charges ($700 total), and pouring and finishing labor are included in the $7,853 project total. Rebar, wire mesh, anchor bolts and embedded items are not part of this estimate, for either materials or installation labor. Site preparation and underground work are completed before forming and concrete placement. After approval, a 25% deposit of $1,963.25 is part of the project total, leaving $5,889.75. The aerial is shown with north up; the overlay shows approximate placement and is not to scale. SITE PLAN + ESTIMATE 1817 East Portland Street PHOENIX, ARIZONA 85006 AERIAL SITE PLAN NOT TO SCALE AREA SCHEDULE 27′ 4″ 23′ 10″ 1 1 ADU FOUNDATION 27′ 4″ × 23′ 10″ / 651 sq/ft 5′ 6′ rear EXISTING HOUSE N LEGEND + DRAWING NOTES Proposed slab footprint ′ = feet · ″ = inches North is up; E Portland St runs along the north side of the lot. Placement is approximate. Per sheet A0, the ADU sits 5′ from the west and 6′ from the rear property line. The area, 651 square feet, is stated on sheet A0; the dimensions are from sheet A1. KEY WORK AREA DIMENSIONS AREA / SQUARE FEET 1 ADU foundation Slab + deep footings, poured together 27′ 4″ × 23′ 10″ 651 NOTHING FOLLOWS TOTAL WORK AREAS: (ONE) 1 OF 1 CONSTRUCTION SPECS CROSS-SECTION DIAGRAM · PLANS DATED 12/09/25, SHEET S1 NOT TO SCALE FOOTING + SLAB, ONE POUR SMOOTH TROWEL FINISH 3,000 PSI CONCRETE 4″ MINIMUM 18″ MINIMUM DEPTH 16″ MINIMUM WIDTH Perimeter footing · approx. 103′ BASE + SUBGRADE: PREPARED SEPARATELY REBAR + ANCHOR BOLTS: NOT IN THIS ESTIMATE SCOPE OF WORK CONCRETEFORMWORKPUMPLABOR 3,000 PSI concreteMaking forms2 truckloadsPouring Slab and footingsIncluded$350 × 2 = $700Finishing Included in the total OUTSIDE THIS ESTIMATE Rebar, wire mesh, anchor bolts and embedded items are not part of this estimate. This applies to both the materials and the labor to install them. Excavation, grading, base preparation and compaction, and underground work are completed separately before forming and concrete placement. ESTIMATED COSTS Slab · 651 sq/ft × $7 $4,557 Footings · 103′ × $32/linear ft $3,296 Pump · 2 truckloads × $350 $700 · included Concrete · approx. 19 cubic yards incl. 10% overage Included Project total $7,853 25% deposit to begin work $1,963.25 Balance after deposit $5,889.75 Once you approve the proposal, the deposit allows us to schedule and prepare; it is part of the total. PORTLAND-2026 / 1817 E PORTLAND ST CONCRETE.MOE / (602) 803-8379 PROPOSAL / 24 OCT 2026 ARCH C / 24″ × 18″

Aerial site plan

Not to scale
27′ 4″ 23′ 10″ 1 1 ADU FOUNDATION 27′ 4″ × 23′ 10″ 651 sq/ft 5′ 6′ rear EXISTING HOUSE E PORTLAND ST N
Proposed slab footprint

Area schedule

1
ADU foundation27′ 4″ × 23′ 10″
651sq/ft

Slab + deep footings. The floor slab and perimeter foundation are formed and poured together.

NOTHING FOLLOWSTOTAL WORK AREAS: (ONE) 1 OF 1

Construction specs

Not to scale
1 2 3 4
  1. Slab4″ minimum, 3,000 PSI concrete, smooth trowel finish.
  2. Perimeter footing103′Outside length, rounded upPoured with the slab; 16″ minimum wide and 18″ minimum below grade.
  3. Rebar and anchor boltsNot part of this estimate.
  4. Base and subgradePrepared separately, before the pour.

From the plans dated 12/09/25: sheet S1, detail 101, and the concrete notes.

Scope of work

Concrete

  • Concrete material
  • 3,000 PSI
  • Slab and all footings

Formwork

  • Making the forms
  • Included in the total

Pump

  • Concrete pump for 2 truckloads
  • $350 × 2 = $700, included

Labor

  • Pouring
  • Finishing

Outside this estimate

Rebar, wire mesh, anchor bolts and embedded items are not part of this estimate. This applies to both the materials and the labor to install them.

Excavation, grading, base preparation and compaction, and underground work are completed separately before forming and concrete placement.

NOT INCLUDED IN THIS ESTIMATE.The project total covers none of the work above.

Itemized estimate

Slab on grade

$4,557

651 sq/ft × $7/sq/ft

4″ slab, 3,000 PSI, smooth trowel finish, including the shower pad.

Foundation footings

$3,296

Approx. 103′ × $32/linear ft

Deep perimeter footing poured with the slab; post footings included.

Concrete pump

Included

2 truckloads × $350 = $700

Included in the slab and footing prices.

Concrete quantity

Included

Approx. 19 cubic yards

Slab and deep footings, including 10% overage.

Your contractor Modesto Valdez concrete.moe Phone(602) 803-8379 Emailcontact@concrete.moe

Drag to pan. Pinch or double-tap to zoom. With a keyboard, use arrow keys to pan, plus and minus to zoom, and 0 to reset the view. Press Escape or Close map to return to the plan.

Concrete work / homeowner proposal

Estimated costs

1817 East Portland Street
Phoenix, Arizona 85006

Project nameportland-2026Proposal for your review
Project nameportland-2026
Prepared24 OCT 2026
Pricing basisSLAB + FOUNDATION FOOTING
Scope of work

Concrete

  • Concrete material
  • 3,000 PSI
  • Slab and all footings

Formwork

  • Making the forms
  • Included in the total

Pump

  • Concrete pump for 2 truckloads
  • $350 × 2 = $700, included

Labor

  • Pouring
  • Finishing
Slab thickness4″ minimum
Concrete3,000 PSI
Footings16″ wide, 18″ below grade, minimum
FinishSmooth trowel

From the plans dated 12/09/25: sheet S1, detail 101, and the concrete notes. The footings are poured with the slab.

Outside this estimate
  • Rebar, wire mesh, anchor bolts and embedded items are not part of this estimate. This applies to both the materials and the labor to install them.
  • Excavation, grading, base preparation and compaction, and underground work are completed separately before forming and concrete placement.
Concrete workQuantityRateAmount
01 · Slab on grade4″ slab, 3,000 PSI, smooth trowel finish; shower pad included651 sq/ft$7/sq/ft$4,557
02 · Foundation footingsDeep perimeter footing poured with the slab; post footings includedApprox. 103′$32/linear ft$3,296
03 · Concrete pumpIncluded in the slab and footing prices2 truckloads$350/truckload$700 · included
04 · Concrete quantitySlab and deep footings, including 10% overageApprox. 19 cubic yards—Included
Project total

Fixed quote for the slab and foundation footing, including formwork, concrete material, $700 pumping, pouring and finishing.

$7,853
Once you approve the proposal

25% deposit to begin work

Once you approve the proposal, a 25% deposit allows us to schedule and prepare for the work. The deposit is part of the $7,853 project total, leaving $5,889.75 after the deposit.

$1,963.25Balance after deposit · $5,889.75